Download a Free Checklist

New fire safety legislation coming into effect in 2026 introduces updated obligations for property owners and Responsible Persons under the BS 5839-1 standard.

We have created a checklist that will help you identify and address the key compliance requirements for your property type.

Checklist for Commercial Offices & Shops – Download Here
Checklist for Landlords & HMOs – Download Here
Checklist for High-Rise Residential (11m+) – Download Here

UK Fire Alarm Regulations BS 5839-1:2025: What Changes in 2026 and What It Means for Your Building

It is important to understand that as a landlord or business owner, the fire safety regulations in the UK have been updated for 2026 and these changes will affect commercial premises, rental properties and high rise residential buildings.

The main change to take into consideration is the full adoption of BS 5839-1:2025, the revised British standard for fire detection and fire alarm systems alongside the new requirements introduced under the Building Safety Act and associated regulations.

If you fall into any of these categories, it is important that you ensure you adhere to the new practices to be fully compliant to the standards set out in the BS 5839-1:2025 British Standard regulation. This article will cover each area and the changes that have been made.

Commercial and Non-Domestic Buildings: BS 5839-1:2025

The 2025 revision of BS 5839-1 is now the required standard for all new fire alarm installations and major system modifications in commercial and non-domestic properties. It replaces earlier guidance and sets out specific requirements around detector types, cabling, documentation and signage.

Smoke Detectors in Sleeping Areas

Under the revised BS 5839-1:2025 standards, heat detectors are no longer considered a compliant method of primary detection in any areas designated for sleeping.

This change has been made due to heat detectors responding slowly to a rise in temperature in the early stages of a fire. In a sleeping area, that time delay can have a life changing impact and by introducing a smoke detector it will give occupants a greater chance in evacuating a building if there is a fire detected.

If your current system still relies on heat detectors in sleeping zones, it will need to be reviewed and upgraded to meet the standard.

Fire-Resistant Red Cabling

All fire alarm wiring, including the mains supply cable now has to be fire-resistant and the wires must be coloured red all the way through. The reason red has been chosen is because it will be easy to identify by anyone working on the building’s electrics and an electrician will not isolate it by mistake.

Previously, fire alarm cabling was not always easily identifiable from other wiring, this created a real risk of disrupting the system without realising during routine maintenance. The move to mandatory red cabling will provide easy identification and improve fire safety measures.

Zone Plans

A printed, accurate zone plan must now be displayed next to the fire alarm control panel. For addressable systems, the digital display must be equally clear and kept current. This has moved from a recommendation to a formal requirement. During any inspection or incident, the absence of a correct zone plan will be recorded as a non-compliance.

For buildings with multiple zones or complex layouts, this is also a practical prompt to check that existing zone plans actually reflect the current configuration of the system, particularly if alterations have been made since the plan was last updated.

False Alarm Notices

Where a fire alarm panel has an active automatic connection to the Fire and Rescue Service, it must now display a notice in a prescribed format: “FALSE ALARM NOTICE: This fire alarm has an active connection to the fire and rescue service.” The purpose is to ensure that building occupants and staff understand that triggering the alarm will result in an emergency response and to reduce the number of unnecessary callouts caused by accidental or malicious activations.

If you are unsure whether your commercial system meets BS 5839-1:2025, a review by a BAFE-accredited specialist is the appropriate next step. Changes identified now are considerably more straightforward to address than remedial work carried out under time pressure after a failed inspection.

Residential and High-Rise Buildings

For residential buildings, that are above 11 metres and 18 metres in height. Several new requirements have come into force under the Building Safety Act and associated regulations. The focus for these changes is to improve better documentation, greater accountability and comprehensive systems for managing evacuations.

Evacuation Alert Systems for Buildings Over 18 Metres

New residential buildings over 18 metres in height must now include a dedicated evacuation alert system, built to BS 8629. This system is separate from the building’s standard fire alarm and is designed specifically for use by the Fire Service during an incident.
It allows firefighters to control evacuations one floor at a time, rather than evacuating the whole building straight away which is often the smarter approach in high-rise buildings where some floors may be told to stay put.

This is a requirement for new builds in this height category and should be factored into design and specification from the outset of any project.

Two Common Staircases

From 30 September 2026, all new residential buildings over 18 metres must be designed with at least two common staircases. This change affects planning applications and architectural design and is intended to ensure that evacuation routes and firefighting access are not compromised if one staircase becomes unavailable during an incident.

If you are at the planning or design stage of a high-rise residential development, this requirement needs to be built into the project from the start.

Interlinked Alarms in Rental Properties

Interlinked smoke alarms, where activating any alarm in a property causes all alarms throughout the property to sound, have been a legal requirement in Scotland for some time. In England and Wales, updated rental regulations now bring this standard into effect. In practical terms, if a smoke alarm activates in a ground-floor kitchen, every alarm in the property must also sound, including those on upper floors where occupants may be asleep.
For landlords who have not yet upgraded to interlinked systems, this is a straightforward change to make, but it does require replacing standalone alarms with interconnected ones, either through a wired system or a compatible radio-interlinked product.

Personal Emergency Evacuation Plans (From 6 April 2026)

From 6 April 2026, the Fire Safety (Residential Evacuation Plans) Regulations place a specific duty on Responsible Persons in high-rise residential buildings. They must arrange person-centred fire risk assessments for residents who may have difficulty evacuating unaided due to mobility limitations, cognitive impairment or other factors and must put Personal Emergency Evacuation Plans (PEEPs) in place for those individuals.
This is a more involved requirement than simply reviewing the fire alarm system. It involves engaging with residents, understanding individual needs and producing documented plans that are kept up to date. Building managers who have not yet started this process should do so without delay.

Landlord note: These changes sit alongside existing obligations under the Smoke and Carbon Monoxide Alarm (Amendment) Regulations. A fire alarm system that does not meet current standards may also have implications for your buildings insurance.

Maintenance and Documentation: The Golden Thread

The Building Safety Regulator (BSR), which became a standalone body in January 2026, is actively enforcing what is known as the Golden Thread, a continuous and accessible record of a building’s safety information across its entire lifetime.
For fire alarms, this means maintenance records and system documentation are part of the legal compliance framework, not a separate administrative exercise.
The table below summarises the key maintenance requirements and what is now expected at each stage:
TaskFrequencyRequirement
User TestingWeeklyTest one different manual call point each week and record it in the logbook.
Professional ServicingEvery 6 monthsMust be carried out by a competent person, ideally BAFE or NAPIT accredited.
Clock SynchronisationEvery 6 monthsEngineers must verify and correct the control panel clock to ensure event logs are legally accurate.
LogbookContinuouslyAll digital or physical records must be kept for the life of the building.

The clock synchronisation item is worth highlighting. It may appear minor, but if the panel clock is running incorrectly, the timestamped event log loses its reliability. In the event of a fire or false alarm, that log may be reviewed as part of an insurance claim or investigation. Ensuring the clock is accurate at every service visit is a simple step that protects the integrity of the record.

All records, whether kept digitally or in a physical logbook must be retained for the life of the building. This is not a new concept, but the BSR is now applying greater scrutiny to whether buildings can actually produce this documentation when asked.

Competency: Who Signs Off the Work?

Under BS 8674:2025, the new competency framework for fire safety professionals, fire risk assessments and system designs must be signed off by individuals who can demonstrate their level of expertise. The framework sets out three levels Foundation, Intermediate and Advanced and being familiar with a particular building is no longer considered a substitute for formal, demonstrable competence.

For building owners and managers, this means it is worth asking the following before commissioning any fire safety work:

  • Does the contractor hold BAFE accreditation for fire detection and alarm systems?
  • Can they confirm their competency level under BS 8674:2025?
  • Are they NAPIT registered for any electrical elements of the installation?
  • Will they provide documentation in a format suitable for your Golden Thread records?
If a contractor cannot answer these questions clearly, it is reasonable to ask for written confirmation before proceeding. Work that is not signed off by a competent person under the current framework may not satisfy your compliance obligations.

A Practical Checklist for 2026

As a starting point, the following covers the main areas worth reviewing if you have not already done so:
  • Check your system against BS 5839-1:2025, particularly regarding detector types in sleeping areas
  • Confirm that fire alarm cabling is fire-resistant and coloured red throughout
  • Ensure your zone plan is accurate and displayed at the panel
  • Verify that six-monthly professional servicing is in place with a qualified contractor
  • For residential buildings over 18 metres, review your obligations under the Building Safety Act, including evacuation alert systems and PEEPs
  • For landlords in England and Wales, confirm that interlinked alarms are installed across your properties
  • Check that anyone carrying out fire safety assessments or system work holds accreditation under BS 8674:2025
The 2026 changes reflect the ongoing effort to raise fire safety standards following lessons learned from major incidents in recent years. Most of the requirements are not entirely new concepts they build on existing good practice. But they are now formal obligations, and the Building Safety Regulator is actively checking compliance.

Need Help Getting Up to Standard?

If you are uncertain about where your building currently stands, a review by an accredited professional is the sensible next step, our team at Elecsec are here to help you.
We supply and install fire alarm systems for domestic, residential and commercial buildings across Bristol and the South-West area. Whether you need a new installation, a system upgrade, or a compliance review, get in touch for a free assessment.